We scan the steel before the pour and flag mistakes while they can still be fixed.
Backed byTrusted by teams building data centers, bridges and airports
Concrete is permanent. So is every mistake poured into it.
Every slab, bridge deck and data hall is accepted because someone checked the steel before concrete covered it. That check is still a tape measure, a checklist and a signature.
Count, size, spacing, cover and laps decide how a structure carries load for decades.
A shrinking pool of inspectors, often the evening before the pour.
Once concrete is placed, the only way back in is X-ray or coring.
A tiny share of rework events…
…caused a third of all rework cost. 19,605 events across 346 projects.
“Records of whether these changes were approved by the design engineer or observed by inspectors in the field are not available.”NIST on the Surfside collapse, June 2026
More concrete is being poured than ever, the people who sign it off are retiring, and regulators now want proof.
US data-center build rate. Up 73% in a year.
Of US code officials are over 45, and retiring faster than they are replaced.
How long NYC now requires inspection photos to be kept. Proof is becoming the law.
Scan the mat. Northframe measures every bar, flags what's off, and hands the inspector a clean record.
With a phone, iPhone LiDAR or the crane camera already on site. No new hardware.
Count, size, spacing, cover and laps against the drawings, before the inspector arrives.
Located, timestamped proof of what's inside the structure, built for the sign-off and the 6-year archive.
Whoever owns the check owns the record of what's inside America's buildings.
IIT Delhi
NTU Singapore