Every bar checked
before it's buried.

We scan the steel before the pour and flag mistakes while they can still be fixed.

Backed byEntrepreneurs First
DRAG TO ORBIT

Trusted by teams building data centers, bridges and airports

Concrete is permanent. So is every mistake poured into it.

The problem

One check. Done once, by hand, hours before it's buried.

Every slab, bridge deck and data hall is accepted because someone checked the steel before concrete covered it. That check is still a tape measure, a checklist and a signature.

01

The steel goes in

Count, size, spacing, cover and laps decide how a structure carries load for decades.

12″ — looks fine
J. Miller, 18:42
02

Someone checks it by hand

A shrinking pool of inspectors, often the evening before the pour.

03

Then it's gone

Once concrete is placed, the only way back in is X-ray or coring.

When the check misses

It never misses small.

Champlain Towers SouthSurfside, FL
Built differently from the drawings. No record inspectors saw the changes.
98 lives
Tropicana garageAtlantic City, NJ
Bottom steel never placed. Signed off as "all steel properly placed."
4 lives
Harmon towerLas Vegas, NV
Faulty rebar found after 15 storeys. Inspection reports showed no problems.
Demolished
McGuire ApartmentsSeattle, WA
Post-tension tendon protection never checked.
Demolished
Geomdan towersIncheon, Korea
Rebar missing in 19 of 32 columns. 17 towers rebuilt.
$420M
0.45% of misses

A tiny share of rework events…

34% of the cost

…caused a third of all rework cost. 19,605 events across 346 projects.

“Records of whether these changes were approved by the design engineer or observed by inspectors in the field are not available.”
NIST on the Surfside collapse, June 2026
Why now

More concrete. Fewer eyes.

More concrete is being poured than ever, the people who sign it off are retiring, and regulators now want proof.

$0B

US data-center build rate. Up 73% in a year.

0%

Of US code officials are over 45, and retiring faster than they are replaced.

0

How long NYC now requires inspection photos to be kept. Proof is becoming the law.

Product

Every bar, checked against the drawings.

Scan the mat. Northframe measures every bar, flags what's off, and hands the inspector a clean record.

L2 deck · Bay C4Pre-pour checkLive

Checks against drawings

Bar count48 / 48✓
Bar size#5✓
Spacing1 issue!
Cover2.0″✓
Lap length30 db✓
StatusScanning mat
01

Capture the mat

With a phone, iPhone LiDAR or the crane camera already on site. No new hardware.

12″ 12″ 15.4″
02

Check every bar

Count, size, spacing, cover and laps against the drawings, before the inspector arrives.

element L2 deck · C4
located 40.7531, −73.9822
checked 06 Nov · 18:42
result  Fixed · passed
for     IBC §1705.3
03

Keep the record

Located, timestamped proof of what's inside the structure, built for the sign-off and the 6-year archive.

Where this goes

Rebar first. Then everything concrete hides.

01RebarThe check every pour needsNow
02Post-tension tendonsSanta Clara condos evacuated after tendons burstNext
03Embeds & anchorsOne misplaced bolt brought down a garageNext
04FirestopDocumented today. Checked by no one.Later

Whoever owns the check owns the record of what's inside America's buildings.

Team

Built by engineers. Backed by EF.

SL

Subhang Ladha

IIT Delhi

JK

Jayesh Kothari

NTU Singapore